Connectivity Degradation
ResolvedDegraded
Times are shown in UTC
- Affected
- GLOBAL
- Started
- How long
- Lasted 7 days
Updates
- Resolved
### Root Cause Analysis (RCA) - Outage on GLOBAL SIM (JT Partner Network) • Impact on Customer(s): During the Incident customers would have seen degrading services for IoT and Sponsored Roaming, with periods of near total outage and respites of restoring service. • Classification: This Incident has JT's highest classification of “Crisis Level” involving the invocation of Business Crisis Management (BCM) and the corresponding attention and follow up attention. • Date and Time of Failure: The root cause was an incorrect configuration executed during a planned works, performed by one of JT’s interconnect partners, at 19:51 on the 28th of August. Some services will have degraded immediately, with the majority of services continuing as normal and suffering degradation much later, resulting in the number of impacted IMSIs steadily increasing. • Cause of Failure: The root cause has been identified as an erroneous configuration change on one of JT's Signalling Partners networks. • Date and Time of Clear: Roaming 30/08/2023 15:45 – Approximately 39 hours • Significant Issues: JT and Velos IoT were not made aware of any planned works being carried out by interconnect partner on their platform and connectivity. • Initial Action Taken: 28th August - 19:51: Alerts seen by the NOC initiated engineering activity whereby two engineers were requested to investigate services (under 30 minutes). Impact was assessed, and the issue was classified as an SI, additional engineering resource was mobilised, and multiple network elements had been reviewed and cleared of fault (IP Core, Firewalls, Signalling switches and other configuration, such as “Hot Standby Router Protocols”). Further engineering resource was mobilised, and service mitigation actions were evaluated. 29th August – 00:25: Remote and physical (STP) card resets had been attempted, the first FPS query failures were seen, and service mitigation was implemented in the form of bypassing the Subscriber Intelligence Lookup Engine (SILE) and directing FPS queries to cached data. Vendor support was engaged, and interconnect partners were put on standby to perform recovery actions. 29th August – 05:36: A Signalling Transfer Point (STP) card had been replaced and engineers increased the bandwidth on interconnect circuits to bring network congestion back to normal levels, part of these remedial actions were allowing customers to bypass Preferred Roaming Solution (PRS / “Steering”). BCM was actioned and official communications provided. 29th August - 10:00: Further traffic management actions have been performed; specific incoming traffic blocked, links shut down or capacity increased to allow network elements time to recover and catch up. Network monitoring shows that mitigating actions were having a positive effect and links are close to pre incident levels of traffic. 29th August - 15:00: With traffic levels stabilised engineers have begun to re-introduce traffic that was blocked. Engineers also allow a firewall bypass for specific traffic; this reduces response time and improves recovery of signalling protocol (critical for enabling roaming). 29th August - 20:00: Traffic levels approach normal and confirmation of out of hours cover and monitoring, including from vendors and interconnect partners has been confirmed. New STP card has been installed and is working as expected, all interconnect partner links have been put back to pre-incident settings. Specific traffic handling (Firewall bypass settings and SILE Cache mode) are going to be left overnight to allow engineers to rest and the network traffic to normalise. NOC are given specific monitoring instructions and put in place extra monitoring patrols. 29th August - 23:59: Utilisation alarms are (re)triggered and NOC action prepared scenario including necessary retainer call outs. Vendor support is escalated, and investigation is quickly launched, it is identified that customers with their own HLR and HSS services are now also impacted. 30th August – 05:00: Engineers’ handover completed and the highest level of vendor support is engaged. Traffic mitigation actions are all repeated with engagement from interconnect partner. At this time, one of JT's interconnect partners reverses their erroneous configuration and shortly after traffic levels are seen to begin to normalise. 30th August 10:00: Links and traffic volumes continue to be closely managed and monitored by engineers and partners. Services are beginning to stabilise and network elements are gradually being returned to pre-incident configurations, JT's interconnect partner, at the root cause of the incident, has begun an investigation into their network configuration and planned works activities. 30th August 19:10: The Service Incident is resolved as all links are restored and traffic has been normalized. The SILE bypass has been removed and FPS queries are all live again. • Causality of the Service Incident: On 28/08/23 at 18:51 UTC JT GRX Interconnect Partner had an issue with a malfunctioning NNI (Network to Network Interface) which caused the blackholing of upstream roaming traffic to multiple US operators. This resulted in a broken GTP Path between JT and multiple major Roaming Partner (RP) networks. Unfortunately, due to the nature of this issue and at the time limited monitoring of an issue of this type, it was difficult to identify. The links to JT’s GRX provider were still UP and routes to all networks were still being advertised. The monitoring on JT side has already been optimised and tested to confirm that JT NOC and engineering teams will receive a Critical Alert should the same incident occur again. This issue was not resolved by the GRX provider until 29/08/23 at 17:11 UTC. Following this issue, on 29/08/23 at 20:19 UTC, the same JT GRX Interconnect Partner performed a change on their network to implement traffic engineering tunnels on a router based in Paris to alleviate some network congestion. Unfortunately, a mistake was made when applying this configuration which led to further blackholing of upstream roaming traffic. After a period of time investigating this issue, JT made a tactical decision to re-route all upstream GRX traffic to the London based PoP at 03:24 UTC, which allowed for upstream GRX traffic to reach the destination RP network successfully. Unfortunately, during both issues, due to broken GTP paths between JT and a large volume of foreign SGSN/SGWs, GRX traffic was impacted towards multiple RP networks, causing JTs GTP Data Session responses (across all RAT Types) to be lost in transit, resulting in a large number of devices being unable to open a data session. Due to the nature of IoT devices and their aggressive behaviour, this caused multiple extremely large influxes of signalling across SS7, Diameter & GTP. What JT witnessed was many devices repeatedly rebooting. The result of this was congestion on the interconnect pipes, JTs core network elements as well as our VAS applications such as the Signalling Firewall & Steering Platforms. This congestion had a knock-on impact on large numbers of devices across the globe and not just the originally impacted regions. • Focus areas:(which will be developed by JT in order to prevent similar incidents and to improve the reaction and the resolution times) 1. BCP plans will be to further develop and strengthen analysis of symptoms and improve mitigation times. (end October 2023). 2. SCCP/IPX/GRX Supplier relationships and contractual agreements will be improved to ensure JT are made aware of planned works and SLAs and response times are suited to the business needs. (end Q4 2023). 3. Signalling monitoring triggers, including GRX in the NOC will be reviewed and improved to provide early detection and cause correlation. (end October 2023). 4. The steering of roaming & to re-balance GRX traffic to potentially limit devices from accessing expensive networks and improving overall restoration time will be improved. (end Q4 2023). 5. Additional actions will be taken to solve issues with bad behaving / recovered devices which are contributing to overall signalling load, and which may be contributing to the signalling storm impacts and recovery. (end Q4 2023). 6. The JT communication plan for incidents will be improved. (end October 2023). 7. The toolset improvements resulting from current upgrades. (Q4 2023)
- Resolved
This incident has been resolved. An RCA will be made available following a full review.
- Monitoring
Service has returned to normal.
- Identified
The signalling engineers have found that the issue is between JT STP - North and the JT IP Core. Both Signalling team and IP Core team are working to find a solution to fix the issue.
- Investigating
Currently we are experience issues with connectivity on JTs network for the GL SIM service. You may experience a degraded service or outage. The signalling engineers are working to find the root cause and implement a solution to fix the issue.
